Once you contact us, we begin with a discussion to understand your long-term EV charging ambitions and immediate requirements. We guide you through the strategic decisions needed to shape a successful scheme.
Understanding these points is essential to developing a tailored solution. Our team will guide you through each consideration.
We undertake a desktop feasibility study to assess estimated costs, usage, revenue, air quality benefits, and suitability for third-party finance.
A key technical consideration is the availability of electrical capacity. Where required, we submit grid connection applications to the local Distribution Network Operator (DNO) on your behalf.
Once DNO responses are received, we assess the potential for private-sector funding on a site-by-site basis.
We review the findings of the feasibility study with you to help determine which sites should progress. Some sites may be deferred for future phases.
At this stage, we also confirm whether a self-funded or third-party financed approach is preferred.
Once sites are confirmed, we carry out full site surveys to refine technical details such as cabling routes and groundworks.
We then present a final proposal outlining agreed designs, confirmed costs, and implementation plans.